Job completed for David L
Completion date: May 7, 2018
Location: Cabot, PA
Why did the customer contact us?
Hole in the basement wall and a window needs boarded up Just talked to homeowner. 3 areas to board up. 2x4 glassblock window, a cellar door, and a 4x6 wall section thru house wall. Cause: meter base and main panel caught on fire. Will need at least 5 sheets osb, 2x4s - 4-6, 3.5 inch screws, and some lag bolts.
Solutions provided:
The basement requires boarding up in three areas due to fire damage caused by the meter base and main panel catching fire. The areas include a 2x4 glass block window, a cellar door, and a 4x6 section of the house wall. Repairs will involve using approximately five sheets of OSB, 4-6 pieces of 2x4s, 3.5-inch screws, and lag bolts to secure the boards. This will ensure the structure is protected until further reconstruction can take place.