Job completed for Bellaire Middle School
Completion date: September 9, 2024
Location: Bellaire, OH
Why did the customer contact us?
Bellaire water department changed meter, it blew and over 20,000 gallons of water has flooded the entire school minus the gym.
Solutions provided:
We responded to a major water loss at a school caused by a blown water meter, resulting in over 20,000 gallons of water flooding the entire building, excluding the gym. Our team performed extensive mitigation services, including water extraction and thorough drying of all affected areas to prevent further damage. Following the mitigation, we began reconstruction efforts, repairing and restoring damaged flooring, walls, and ceilings to bring the school back to its pre-loss condition.